Quick answers
What is this project?
River Bed Mining Project at Block 1/1 ,Tawi River Upstream Dhar-Udhampur Road Bridge ,Kishanpur Manwal,Jammu is an approved mining project in Chiani, Ramnagar, Udhampur, Jammu and Kashmir. The site covers 12.6 acres.
Who is building it?
The applicant is Pavan Sharma.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 6 Mar 2025), as of 27 Nov 2026.
Where is it?
In Chiani, Ramnagar, Udhampur, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹83 lakh and a site of 12.6 acres.
When was it filed?
The application was filed on 20 Sept 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 6 Mar 2025 |
| Application filed | 20 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Pavan Sharma |
| Land area | 12.6 acres (5.1 ha) |
| Project cost | ₹83 lakh |
| Village / locality | Chiani |
| Taluk / tehsil | Ramnagar |
| District | Udhampur |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00098 |
In context
14 applications in Udhampur since January 2022 are in the same category (Mining): 10 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 12.6 acres, this one is larger than 50% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Chiani, Ramnagar, Udhampur, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Wss Pinger — forest land use approved, 2.7 km away
- WSS DARSOO GUDDAR (Jammu Forest Division) — forest land use approved, 2.7 km away
- Wss Pinger , Jindrah Under Jjm — forest land use approved, 3.4 km away
- River Bed mining Projectat block no 1/5 Jammu — environmental approval granted, 3.4 km away
- 4G Saturation Project Kashir — forest land use approved, 4.6 km away
- USO 4G Saturation — lapsed, 4.6 km away
- Improvement and augmentation of WSS Darsoo Guddar — forest land use approved, 4.9 km away
- 4G Saturation Project Gudhar — forest land use approved, 5.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.