Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Jun 2025 |
| Application filed | 5 Jan 2024 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Anil Kumar |
| Land area | 6 acres (2.4 ha) |
| Project cost | ₹2.1 crore |
| Village / locality | Arnas |
| Taluk / tehsil | Gool-Gulabgarh |
| District | Reasi |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00099 |
In context
27 applications in Reasi since January 2022 are in the same category (Mining): 22 approved, 0 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 6 acres, this one is smaller than 93% of them.
No other mining lease on record is within 500 m of this site; 6 have applied within 5 km.
Where it is
Arnas, Gool-Gulabgarh, Reasi, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Minor Mineral (River Bed material) Project at Block -28, Area-6.94 ha at… — environmental approval granted, 2 km away
- Retrofitting of WSS Judda-II — forest land use approved, 2.4 km away
- Collection of Pit/Trench Samples for Ore Beneficiation of Bauxite Bearing… — lapsed, 2.6 km away
- Collection of Pit Trench Samples for Ore Benificiation of Lithium Based… — lapsed, 3.2 km away
- Minor Mineral (River Bed Material) Mining Project Block-15, Area of 9.08 ha at… — environmental approval granted, 3.6 km away
- Retrofitting of WSS Arnas — more information requested, 3.6 km away
- Retrofitting of WSS Arnas — lapsed, 3.6 km away
- Wss Juda — lapsed, 3.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.