What is Developing? Open the mapMap

Not approvedMining · Doda, Jammu and Kashmir

Minor Mineral RBM (River Bed Material) Block Doda-II an area of 0.71 ha

Minor Mineral RBM (River Bed Material) Block Doda-II an area of 0.71 ha is a rejected mining project in Chegsu, Thathri, Doda, Jammu and Kashmir. The site covers 1.8 acres. Its stated project cost is ₹3.4 crore. As of 27 Nov 2026, its status is “Not approved” (since 16 Apr 2025).

See it on the live map All projects in Doda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleMinor Mineral RBM (River Bed Material) Block Doda-II an area of 0.71 ha at Chenab River Near Village-Kandoth, Tehsil-Thathri, District-Doda J&K (U.T.) in favor of Sh Imtiaz Ahmad Shan, R/O- H.No.-05, Green Hill Colony Bathindi, District- Jammu, J&K.
StatusNot approved
Status since16 Apr 2025
Application filed26 Dec 2024
Approval soughtEnvironmental approval
Application typeNew project
SectorMining
ApplicantImtiaz Shan
Land area1.8 acres (0.7 ha)
Project cost₹3.4 crore
Village / localityChegsu
Taluk / tehsilThathri
DistrictDoda
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00161

In context

11 applications in Doda since January 2022 are in the same category (Mining): 2 approved, 0 filed or under review, and 9 withdrawn, lapsed or rejected. At 1.8 acres, this one is smaller than 100% of them.

2 other mining leases have applied within 500 m of this site; together with this one they cover 12 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 7 mining leases have applied within 5 km.

Where it is

Chegsu, Thathri, Doda, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Imtiaz Shan in Doda

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.