What is Developing? Open the mapMap

LapsedMining · Rajouri, Jammu and Kashmir

Minor Mineral River Bed Material Mining Project Block No. 3/7, Nowshera Tawi River Downstream Nowshera Jabba Bridge

Minor Mineral River Bed Material Mining Project Block No. 3/7, Nowshera Tawi River Downstream Nowshera Jabba Bridge is a lapsed mining project in Bakhar, Sundarbani, Rajouri, Jammu and Kashmir. The site covers 8.6 acres. Its stated project cost is ₹1.7 crore. As of 27 Nov 2026, its status is “Lapsed” (since 29 Oct 2024).

See it on the live map All projects in Rajouri

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since29 Oct 2024
Application filed1 Feb 2024
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantSH. Sanjay Mehta
Land area8.6 acres (3.5 ha)
Project cost₹1.7 crore
Village / localityBakhar
Taluk / tehsilSundarbani
DistrictRajouri
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00168

In context

25 applications in Rajouri since January 2022 are in the same category (Mining): 20 approved, 0 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 23 months from filing to approval. At 8.6 acres, this one is smaller than 56% of them.

No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.

Where it is

Bakhar, Sundarbani, Rajouri, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from SH. Sanjay Mehta in Rajouri

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.