What is Developing? Open the mapMap

LapsedMining · Samba, Jammu and Kashmir

Minor Mineral (River Bed Material) Mining Project, Block No. 1/5 (Block Area-9.51 ha.), Devak River Upstream Railway Bridge, Samba Village- Guraslathia, Tehsil- Vijaypur, District Samba, J&K U.T

Minor Mineral (River Bed Material) Mining Project, Block No. 1/5 (Block Area-9.51 ha.), Devak River Upstream Railway Bridge, Samba Village- Guraslathia, Tehsil- Vijaypur, District Samba, J&K U.T is a lapsed mining project in Madak (Un-Inhabited), Samba, Jammu and Kashmir. The site covers 23.5 acres. Its stated project cost is ₹2.2 crore. As of 27 Nov 2026, its status is “Lapsed” (since 30 Apr 2025).

See it on the live map All projects in Samba

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since30 Apr 2025
Application filed30 Apr 2025
Approval soughtEnvironmental approval
Application typeOwnership transfer
SectorMining
ApplicantChoudhary Power Projects Private Limited
Land area23.5 acres (9.5 ha)
Project cost₹2.2 crore
Village / localityMadak (Un-Inhabited)
Taluk / tehsilSamba
DistrictSamba
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00210

In context

23 applications in Samba since January 2022 are in the same category (Mining): 15 approved, 0 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 23.5 acres, this one is smaller than 52% of them.

No other mining lease on record is within 500 m of this site; 2 have applied within 5 km.

Where it is

Madak (Un-Inhabited), Samba, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Choudhary Power Projects Private Limited in Samba

4 Choudhary Power Projects projects in Samba
All 24 Choudhary Power Projects projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.