One of 2 filings for this project. The project's main page, with every filing and where each stands: Expansion of Production Capacity
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 12 Feb 2026 |
| Application filed | 4 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Uflex Limited |
| Land area | 5.3 acres (2.1 ha) |
| Project cost | ₹283.2 crore |
| Village / locality | Badori |
| Taluk / tehsil | Samba |
| District | Samba |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00222 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 21 May 2026 | Environmental approval granted | 5.3 acres | ₹283.2 crore |
| Early planning filed 4 Mar 2025 (this page) | Cleared for impact study | 5.3 acres | ₹283.2 crore |
In context
26 applications in Samba since January 2022 are in the same category (Industry): 12 approved, 2 filed or under review, and 12 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 5.3 acres, this one is larger than 62% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Badori, Samba, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Production Capacity — environmental approval granted, 0 m away
- Manufacturing of Lead Ingots, Pig Ingots and Battery Plates Through Mechanised… — under environmental review, 250 m away
- Existing Steel Manufacturing unit "M/s Quality Casting Industries" — withdrawn, 750 m away
- Expansion of existing Steel Manufacturing Unit namely M/s Quality Casting… — cleared for impact study, 750 m away
- Induction furnace with production capacity of 28,000 TPA Billets/Ingots with… — environmental approval granted, 1.2 km away
- Industrial project by M/s Shakti Tools India Ltd. Manufacturing of TMT,… — not approved, 1.2 km away
- Industrial project by M/s Shakti Tools India Ltd. Manufacturing of TMT,… — cleared for impact study, 1.2 km away
- Expansion of existing Steel Manufacturing Unit namely M/s Vijay Steel… — not approved, 1.3 km away
All 5 Uflex projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.