Project details
| Status | Lapsed |
|---|---|
| Status since | 9 Jan 2026 |
| Application filed | 27 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Waste management |
| Applicant | Jammu & Kashmir State Industrial Development Corporation Limited |
| Land area | 2,000 m² |
| Project cost | ₹5.3 crore |
| Village / locality | Gogoo |
| Taluk / tehsil | Budgam |
| District | Badgam |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00226 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gogoo, Budgam, Badgam, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction for Expansion of New Integrated Terminal Building and Allied… — environmental approval granted, 3.1 km away
- Minor Mineral Block No-12, Chadoora Foot Bridge to Sogam Bridge Upstream… — lapsed, 5.6 km away
- Minor Mineral Block Mining Project, Block- 10/Bud, Panzan Bridge to Dregam… — lapsed, 5.6 km away
- Minor Mineral (RBM) Mining Project, Block- 10/Bud, Panzan Bridge to Dregam… — lapsed, 5.6 km away
- Nallah Bed Mining Project is situated at Minor Mineral Block No. 11 Chadoora… — lapsed, 5.9 km away
- Building project by Areesha Royal Hospital Pvt Ltd. — environmental approval granted, 10 km away
- Satellite Township (Phase-1) Rakh Gund Aksha Bemina, Srinagar — under environmental review, 10.3 km away
- Minor Mineral (River Bed Material) Mining Project, Block No.-37/C, Chewa… — lapsed, 14.7 km away
All 8 Jammu & Kashmir State Industrial Development Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.