Project details
| Status | Lapsed |
|---|---|
| Status since | 25 Jun 2025 |
| Application filed | 20 Mar 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Noor Mohammad Trumboo |
| Land area | 3.9 acres (1.6 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Dhani Saidan |
| Taluk / tehsil | Uri |
| District | Baramula |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00234 |
In context
26 applications in Baramula since January 2022 are in the same category (Mining): 3 approved, 3 filed or under review, and 20 withdrawn, lapsed or rejected. At 3.9 acres, this one is smaller than 96% of them.
No other mining lease on record is within 500 m of this site; 5 have applied within 5 km.
Where it is
Dhani Saidan, Uri, Baramula, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- WSS Dara Gutliyan — lapsed, 400 m away
- WSS Dara Gutliyan — forest land use approved, 400 m away
- Minor Mineral (Gypsum) Mining Project, proposal for obtaining Environmental… — lapsed, 1.3 km away
- WSS Dhani Syedan — lapsed, 1.4 km away
- WSS Dhani Syedan — forest land use approved, 1.5 km away
- WSS Zamboor pattan — forest land use approved, 2.1 km away
- WSS Zamboor pattan — lapsed, 2.2 km away
- Chhat Zorawar Operational Track — more information requested, 2.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.