Quick answers
What is this project?
Minor Mineral (River Bed Material) Shri Mohammad Yaseen Parray, S/O Shri Mohammad Yaqoob Parray Block -23 an area of 9.09 ha Ashmuji Bridge Upstream Vishu Nallah Village Ashmuji Tehsil District Kulgam J.K .U.T is an approved mining project in Paniwah, Kulgam, Jammu and Kashmir. The site covers 22.5 acres.
Who is building it?
The applicant is Mohammad Yaseen Parrey.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 25 Nov 2025), as of 27 Nov 2026.
Where is it?
In Paniwah, Kulgam, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹2.1 crore and a site of 22.5 acres.
When was it filed?
The application was filed on 25 Nov 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 25 Nov 2025 |
| Application filed | 25 Nov 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Mohammad Yaseen Parrey |
| Land area | 22.5 acres (9.1 ha) |
| Project cost | ₹2.1 crore |
| Village / locality | Paniwah |
| Taluk / tehsil | Kulgam |
| District | Kulgam |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00240 |
In context
18 applications in Kulgam since January 2022 are in the same category (Mining): 8 approved, 1 filed or under review, and 9 withdrawn, lapsed or rejected. At 22.5 acres, this one is larger than 83% of them.
No other mining lease on record is within 500 m of this site; 9 have applied within 5 km.
Where it is
Paniwah, Kulgam, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposal River Bed Material Mining Project, Block- 24 an area of 4.33 ha at… — lapsed, 950 m away
- Nallah Bed Mining — lapsed, 1.5 km away
- Minor Mineral Block No. 25 — environmental approval granted, 1.7 km away
- Minor Mineral Block No – 26, Z- Ashmuji Bridge Downstream Vishu Nallah,… — environmental approval granted, 2.3 km away
- Minor Mineral Block-20, (Revised working area 1.85ha.) T-Brazlo Bridge… — initial checks, 2.7 km away
- Minor Mineral (River Bed Mineral) Mining revised area 1.85 hectare, Block no.… — lapsed, 2.7 km away
- Minor Mineral Block-20, (Revised working area 1.85ha.) T-Brazlo Bridge… — lapsed, 2.7 km away
- The mine lease area is situated at Minor Mineral Block No.:– 19 S-Kulgam… — environmental approval granted, 3.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.