Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 12 Feb 2026 |
| Application filed | 1 Dec 2025 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Amit Gupta S/O Ashok Kumar |
| Land area | 7.4 acres (3 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Dohgani |
| Taluk / tehsil | Rajouri |
| District | Rajouri |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00291 |
In context
25 applications in Rajouri since January 2022 are in the same category (Mining): 20 approved, 0 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 23 months from filing to approval. At 7.4 acres, this one is smaller than 72% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Dohgani, Rajouri, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Bed Mineral (RBM) Mining Project Block-1/4, Nowshera Tawi River,… — lapsed, 0 m away
- Obtaining Environmental Clearance of the area for Minor Mineral Block (River… — lapsed, 850 m away
- WSS Potha — forest land use approved, 1.3 km away
- WSS Dalogra — forest land use approved, 1.9 km away
- Obtaining Environmental Clearance of the area for Minor Mineral Block (River… — lapsed, 2.1 km away
- WSS Androlla — forest land use approved, 2.6 km away
- Obtaining Environmental Clearance of the area for Minor Mineral Block (River… — environmental approval granted, 2.6 km away
- WSS Saranoo Thathi — forest land use approved, 3.4 km away
More from Amit Gupta S/O Ashok Kumar in Rajouri
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.