Quick answers
What is this project?
Minor Mineral (River Bed Material) Mining Project, Block-4/4, (Block Area of 9.64 ha.) Bein River Upstream NH-1A Bridge, Samba Village-Chak Raghu, Tehsil-Ghagwal, District- Samba J&K U.T is a lapsed mining project in Gurah Mehtian, Hiranagar, Kathua, Jammu and Kashmir. The site covers 23.8 acres.
Who is building it?
The applicant is Rakesh Kumar Choudhary Private Limited.
Has it been approved?
No. The application was lapsed on 30 Apr 2025, so it is no longer under consideration.
Where is it?
In Gurah Mehtian, Hiranagar, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹1.7 crore and a site of 23.8 acres.
When was it filed?
The application was filed on 30 Apr 2025.
Project details
| Status | Lapsed |
|---|---|
| Status since | 30 Apr 2025 |
| Application filed | 30 Apr 2025 |
| Approval sought | Environmental approval |
| Application type | Ownership transfer |
| Sector | Mining |
| Applicant | Rakesh Kumar Choudhary Private Limited |
| Land area | 23.8 acres (9.6 ha) |
| Project cost | ₹1.7 crore |
| Village / locality | Gurah Mehtian |
| Taluk / tehsil | Hiranagar |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00299 |
In context
25 applications in Kathua since January 2022 are in the same category (Mining): 21 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 23.8 acres, this one is larger than 76% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Gurah Mehtian, Hiranagar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- (River Bed Material) Project Village- Rei, Tehsil Ghagwal, District- Samba,… — environmental approval granted, 4.2 km away
- Water Supply Scheme Siada — lapsed, 8.6 km away
- Provision of Pipeline Incl Connected Items for Supply of Water to Dayalachak… — forest land use approved, 9.4 km away
- Provision of Pipeline Including Connected Items for Supply of Water for Ascon… — lapsed, 9.4 km away
- Water Supply Scheme Dhalta — lapsed, 10.2 km away
- Standalone Grinding Unit with Cement Production Capacity of 2.0 Million TPA… — cleared for impact study, 12.7 km away
- Wss Seswan — lapsed, 13.6 km away
- Water Supply Scheme Dinga Amb — lapsed, 14.2 km away
All 11 Rakesh Kumar Choudhary projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.