What is Developing? Open the mapMap

Environmental approval grantedMining · Kupwara, Jammu and Kashmir

Minor Mineral River Bed Mineral (RBM) Mining Project Block No.-2 Shedipora, Rukh machwari (Bakahakar) Bridge to Kachiwara Downstream, Tarli Nallah, Village Bakahakar Rajwar, District Kupwara J&K U.T.

Minor Mineral River Bed Mineral (RBM) Mining Project Block No.-2 Shedipora, Rukh machwari (Bakahakar) Bridge to Kachiwara Downstream, Tarli Nallah, Village Bakahakar Rajwar, District Kupwara J&K U.T is an approved mining project in Krum Hoora (Krim Har), Handwara, Kupwara, Jammu and Kashmir. The site covers 9.6 acres. Its stated project cost is ₹90 lakh. As of 27 Nov 2026, its status is “Environmental approval granted” (since 13 Jan 2026).

See it on the live map All projects in Kupwara

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Minor Mineral River Bed Mineral (RBM) Mining Project Block No.-2 Shedipora, Rukh machwari (Bakahakar) Bridge to Kachiwara Downstream, Tarli Nallah, Village Bakahakar Rajwar, District Kupwara J&K U.T is an approved mining project in Krum Hoora (Krim Har), Handwara, Kupwara, Jammu and Kashmir. The site covers 9.6 acres.

Who is building it?

The applicant is Reyaz Ahmad Sofi.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 13 Jan 2026), as of 27 Nov 2026.

Where is it?

In Krum Hoora (Krim Har), Handwara, Kupwara, Jammu and Kashmir.

How big is it?

It has a stated cost of ₹90 lakh and a site of 9.6 acres.

When was it filed?

The application was filed on 13 Jan 2026.

Project details

StatusEnvironmental approval granted
Status since13 Jan 2026
Application filed13 Jan 2026
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantReyaz Ahmad Sofi
Land area9.6 acres (3.9 ha)
Project cost₹90 lakh
Village / localityKrum Hoora (Krim Har)
Taluk / tehsilHandwara
DistrictKupwara
StateJammu and Kashmir
Location fromSite area on record
Our referenceWID-JK-00304

In context

11 applications in Kupwara since January 2022 are in the same category (Mining): 5 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. At 9.6 acres, this one is larger than 55% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Krum Hoora (Krim Har), Handwara, Kupwara, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.