Environmental approval grantedMining · Udhampur, Jammu and Kashmir

Minor Mineral (River Bed material) Project at Block – 11 having an area of 1.68 ha. At Ramnagar Wali Khad downstream Gulang Bridge, Village Dalsar, Tehsil-Ramnagar & District Udhampur JK UT in favor of Shri Umesh Kumar Sharma, S/O Shri Naryan Sharma

Minor Mineral (River Bed material) Project at Block – 11 having an area of 1.68 ha. At Ramnagar Wali Khad downstream Gulang Bridge, Village Dalsar, Tehsil-Ramnagar & District Udhampur JK UT in favor of Shri Umesh Kumar Sharma, S/O Shri Naryan Sharma is an approved mining project in Martha, Ramnagar, Udhampur, Jammu and Kashmir. The site covers 4.2 acres. Its stated project cost is ₹1.2 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 8 Jun 2026).

See it on the live map All projects in Udhampur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Minor Mineral (River Bed material) Project at Block – 11 having an area of 1.68 ha. At Ramnagar Wali Khad downstream Gulang Bridge, Village Dalsar, Tehsil-Ramnagar & District Udhampur JK UT in favor of Shri Umesh Kumar Sharma, S/O Shri Naryan Sharma is an approved mining project in Martha, Ramnagar, Udhampur, Jammu and Kashmir. The site covers 4.2 acres.

Who is building it?

The applicant is M/S Umesh Kumar.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 8 Jun 2026), as of 27 Nov 2026.

Where is it?

In Martha, Ramnagar, Udhampur, Jammu and Kashmir.

How big is it?

It has a stated cost of ₹1.2 crore and a site of 4.2 acres.

When was it filed?

The application was filed on 8 Jun 2026.

Project details

StatusEnvironmental approval granted
Status since8 Jun 2026
Application filed8 Jun 2026
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantM/S Umesh Kumar
Land area4.2 acres (1.7 ha)
Project cost₹1.2 crore
Village / localityMartha
Taluk / tehsilRamnagar
DistrictUdhampur
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00311

In context

14 applications in Udhampur since January 2022 are in the same category (Mining): 10 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 4.2 acres, this one is smaller than 100% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Martha, Ramnagar, Udhampur, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.