What is Developing? Open the mapMap

Environmental approval grantedMining · Anantnag, Jammu and Kashmir

River Bed Mining Project situated at Minor Mineral Block No. 01, ANG/SA/01 Dooru Bridge Sandran Nallah, Downstream Village Dooru, District, Anantnag JK U.T. under proposal over an resized area of 2.40 ha.

River Bed Mining Project situated at Minor Mineral Block No. 01, ANG/SA/01 Dooru Bridge Sandran Nallah, Downstream Village Dooru, District, Anantnag JK U.T. under proposal over an resized area of 2.40 ha is an approved mining project in Booch, Kokernag, Anantnag, Jammu and Kashmir. The site covers 5.9 acres. Its stated project cost is ₹2.3 crore. As of 27 Nov 2026, its status is “Environmental approval granted” (since 10 Mar 2026).

See it on the live map All projects in Anantnag

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

River Bed Mining Project situated at Minor Mineral Block No. 01, ANG/SA/01 Dooru Bridge Sandran Nallah, Downstream Village Dooru, District, Anantnag JK U.T. under proposal over an resized area of 2.40 ha is an approved mining project in Booch, Kokernag, Anantnag, Jammu and Kashmir. The site covers 5.9 acres.

Who is building it?

The applicant is Mohammad Deva.

Has it been approved?

Yes. Its status is “Environmental approval granted” (since 10 Mar 2026), as of 27 Nov 2026.

Where is it?

In Booch, Kokernag, Anantnag, Jammu and Kashmir.

How big is it?

It has a stated cost of ₹2.3 crore and a site of 5.9 acres.

When was it filed?

The application was filed on 10 Mar 2026.

Project details

StatusEnvironmental approval granted
Status since10 Mar 2026
Application filed10 Mar 2026
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantMohammad Deva
Land area5.9 acres (2.4 ha)
Project cost₹2.3 crore
Village / localityBooch
Taluk / tehsilKokernag
DistrictAnantnag
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00337

In context

11 applications in Anantnag since January 2022 are in the same category (Mining): 5 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected. At 5.9 acres, this one is smaller than 100% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Booch, Kokernag, Anantnag, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.