What is Developing? Open the mapMap

LapsedMining · Pulwama, Jammu and Kashmir

Minor Mineral (River Bed material) Project at Block – 12/D having an area of 2.20 ha. At Bundzoo Bridge downstream Nallah Sasara, Nill- Bundzoo, Taluka -Bundzoo,District Pulwama J&K U.T. in favor of Shri Ranbir Singh

Minor Mineral (River Bed material) Project at Block – 12/D having an area of 2.20 ha. At Bundzoo Bridge downstream Nallah Sasara, Nill- Bundzoo, Taluka -Bundzoo,District Pulwama J&K U.T. in favor of Shri Ranbir Singh is a lapsed mining project in Gusu, Pulwama, Jammu and Kashmir. The site covers 5.4 acres. Its stated project cost is ₹85 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 20 Nov 2026).

See it on the live map All projects in Pulwama

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

StatusLapsed
Status since20 Nov 2026
Application filed31 Jul 2026
Approval soughtEnvironmental approval
Application typeValidity extension
SectorMining
ApplicantRanbir Singh S/O Gulwant Singh
Land area5.4 acres (2.2 ha)
Project cost₹85 lakh
Village / localityGusu
Taluk / tehsilPulwama
DistrictPulwama
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-00346

In context

15 applications in Pulwama since January 2022 are in the same category (Mining): 4 approved, 3 filed or under review, and 8 withdrawn, lapsed or rejected. At 5.4 acres, this one is smaller than 100% of them.

No other mining lease on record has applied within 5 km of this site.

Where it is

Gusu, Pulwama, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.