Quick answers
What is this project?
River Bed Mining in Ujh River area 3.98ha Downstream Pandori Bridge, Village-Pandori, Tehsil-Nagri Parole & District-Kathua is an approved mining project in Chak Bhohalan (Un-Inhabited), Hiranagar, Kathua, Jammu and Kashmir. The site covers 9.8 acres.
Who is building it?
The applicant is M/S Paramjeet Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Apr 2026), as of 27 Nov 2026.
Where is it?
In Chak Bhohalan (Un-Inhabited), Hiranagar, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹75 lakh and a site of 9.8 acres.
When was it filed?
The application was filed on 14 Jan 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Apr 2026 |
| Application filed | 14 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | M/S Paramjeet Singh |
| Land area | 9.8 acres (4 ha) |
| Project cost | ₹75 lakh |
| Village / locality | Chak Bhohalan (Un-Inhabited) |
| Taluk / tehsil | Hiranagar |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00352 |
In context
25 applications in Kathua since January 2022 are in the same category (Mining): 21 approved, 0 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 9.8 acres, this one is smaller than 88% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Chak Bhohalan (Un-Inhabited), Hiranagar, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- River Bed Mining in Ujh River having an area of 9.85 ha — environmental approval granted, 4.3 km away
- River Bed Mining in Ujh River having an area of 8 ha — environmental approval granted, 4.5 km away
- River Bed Mining in Ujh River having an area of 9.65 ha — environmental approval granted, 4.9 km away
- Industrial project by M/s Kargil steel and Power Ltd. — not approved, 10 km away
- Manufacturing of Synthetic Filament Yarns and High IV chips — not approved, 10.5 km away
- Proposed Expansion of Manufacturing of Aluminium products from 0.0580 MTPA to… — cleared for impact study, 10.6 km away
- Manufacturing plant of Recycled PET flakes , Recycled PET resin and PET… — lapsed, 10.7 km away
- Industrial shed at at Plot No. 6, SIDCO Industrial Estate Bhagthali,… — under environmental review, 10.8 km away
More from M/S Paramjeet Singh in Kathua
- River Bed Mining in Ujh River having an area of 9.85 ha — environmental approval granted
- River Bed Mining in Ujh River having an area of 9.65 ha — environmental approval granted
- River Bed Mining in Ujh River having an area of 8 ha — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.