Quick answers
What is this project?
Minor Mineral (River Bed material) Project at Block – 28 having an area of 8.89 ha is a proposed mining project in Devi Pora, Anantnag, Jammu and Kashmir. The site covers 22 acres.
Who is building it?
The applicant is Kapil Aggarwal.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Devi Pora, Anantnag, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹1.1 crore and a site of 22 acres.
When was it filed?
The application was filed on 25 May 2026.
Project details
| Official title | Minor Mineral (River Bed material) Project at Block – 28 having an area of 8.89 ha. At A2-Mah Village Downstream Vishu Nalla, District-Kulgam, J&K U.T. in favor of Shri Kapil Agarwal, S/O Shri Jugesh Agarwal |
|---|---|
| Status | Under environmental review |
| Status since | 26 Nov 2026 |
| Application filed | 25 May 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Kapil Aggarwal |
| Land area | 22 acres (8.9 ha) |
| Project cost | ₹1.1 crore |
| Village / locality | Devi Pora |
| Taluk / tehsil | Anantnag |
| District | Anantnag |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00381 |
In context
11 applications in Anantnag since January 2022 are in the same category (Mining): 5 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected. At 22 acres, this one is larger than 70% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Devi Pora, Anantnag, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Solid Waste Management Facility at Uranhal, Anantnag by Municipal… — lapsed, 8.6 km away
- Proposed Solid Waste Management Facility at Uranhal, Anantnag by Municipal… — returned to applicant, 8.6 km away
- Proposed Solid Waste Management Facility at Uranhal, Anantnag by Municipal… — environmental approval granted, 8.6 km away
- Proposed Solid Waste Management Facility at Uranhal, Anantnag by Municipal… — cleared for impact study, 8.6 km away
- River Bed Mineral (RBM) Mining Project, Block -4, Revised Area -4.88 Ha., At… — lapsed, 11.2 km away
- MINOR MINERAL BLOCK NO – 10, ANG/SA/10 Hillar Bridge, Bringi Nallah… — environmental approval granted, 13.3 km away
- Mining project by M/S Bawan Minerals — lapsed, 13.5 km away
- Mining project by M/S Bawan Minerals — cleared for impact study, 13.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.