Quick answers
What is this project?
Minor Mineral (River Bed Material) Mining Project, Block No.11, K-Mirhama Upstream Vishu Nalla, District-Kulgam, JK UT Area 9.21 ha is an approved mining project in Rakha Pora Nack Pora, Shopian, Shupiyan, Jammu and Kashmir. The site covers 22.8 acres.
Who is building it?
The applicant is Hem Chand Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Mar 2026), as of 27 Nov 2026.
Where is it?
In Rakha Pora Nack Pora, Shopian, Shupiyan, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹80 lakh and a site of 22.8 acres.
When was it filed?
The application was filed on 26 Mar 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Mar 2026 |
| Application filed | 26 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Validity extension |
| Sector | Mining |
| Applicant | Hem Chand Singh |
| Land area | 22.8 acres (9.2 ha) |
| Project cost | ₹80 lakh |
| Village / locality | Rakha Pora Nack Pora |
| Taluk / tehsil | Shopian |
| District | Shupiyan |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00397 |
In context
19 applications in Shupiyan since January 2022 are in the same category (Mining): 16 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected. At 22.8 acres, this one is larger than 68% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Rakha Pora Nack Pora, Shopian, Shupiyan, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Minor Mineral (River Bed material) Project, Block – 07 having an area of 8.91… — environmental approval granted, 3.1 km away
- Up-gradation and Maintenance of Road from MRL01-Chowgam Sedov Aharbal… — forest land use approved, 14.8 km away
- Up-gradation and Maintenance of Road from MRL01-Chowgam Sedow Aharbal, Stage… — lapsed, 14.8 km away
- Wss Chek Ireshnagri Linear — lapsed, 15 km away
- Wss Chek Ireshnagri Linear — forest land use approved, 15 km away
- Wss Balpora Ganowpora — lapsed, 15.2 km away
- Wss Devgam Ganowpora — lapsed, 15.2 km away
- Wss Checki Reshnagri — lapsed, 15.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.