Project details
| Status | Forest land use approved |
|---|---|
| Status since | 15 Jul 2026 |
| Application filed | 2 Apr 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 300 m² |
| Forest land | 250 m² |
| Project cost | ₹24 lakh |
| Village / locality | Poshiana |
| Taluk / tehsil | Surankote |
| District | Punch |
| State | Jammu and Kashmir |
| Location from | Site area on record |
| Our reference | WID-JK-00520 |
In context
21 applications in Punch since January 2022 are in the same category (Telecom): 11 approved, 4 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 0.1 acres, this one is smaller than 90% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Poshiana, Surankote, Punch, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G saturation Project Peer Ki Gali Sopian — lapsed, 0 m away
- 4G saturation Project Peer Ki Gali Sopian — decision issued, 0 m away
- 4G Saturation Project Peer Ki Gali — more information requested, 0 m away
- Cafeteria Cum Tourist Facilitation Centre With Accommodation Facilities, Park… — under wildlife review, 150 m away
- Diversion of 0.0225 HA. of Forest Land for construction of Mobile Tower for… — lapsed, 1.1 km away
- 4G Saturation Project Chatta Paani — forest land use approved, 3.4 km away
- 4G Saturation Project Chatta Paani — more information requested, 3.4 km away
- 4G Saturation Project Poshana — more information requested, 3.7 km away
More from Mahesh Nair in Punch
- 4G Saturation Project Allah Khori (Chandimarh) — forest land use approved
- 4G Saturation Project Allah Khodi — lapsed
- 4G Saturation Project Peer Ki Gali — more information requested
- 4G Saturation Project Upper Kulain Naarol — forest land use approved
- 4G Saturation Project Chatta Paani — forest land use approved
- 4G Saturation Project Banwat Upper — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.