Quick answers
What is this project?
Design, Engineering, Supply, Installation, Testing Commissioning and Annual Maintenance Service of Flood Early Warning System for Hydro Power Project 105 MW USHP-II Kangan District Ganderbal is a proposed power project in Wangat, Kangan, Ganderbal, Jammu and Kashmir. The site covers 0 acres.
Who is building it?
The applicant is Jammu & Kashmir Power Development Coprporation Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Wangat, Kangan, Ganderbal, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹2.7 crore; a site of 0 acres and 80 m² of forest land.
When was it filed?
The application was filed on 21 Jul 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 4 Nov 2026 |
| Application filed | 21 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Jammu & Kashmir Power Development Coprporation Limited |
| Land area | 200 m² |
| Forest land | 80 m² |
| Project cost | ₹2.7 crore |
| Village / locality | Wangat |
| Taluk / tehsil | Kangan |
| District | Ganderbal |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00571 |
Where it is
Wangat, Kangan, Ganderbal, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 20,000 Gallons Capacity Service Reservoir including Sluice Chamber at Waniyarm… — under wildlife review, 7.6 km away
- Construction of Panchayat Secretariat Phase-I at Wangath-B. — lapsed, 9.8 km away
- L025-(Link) From Kachnambal Bala Road (R and B) Km Ist Rd 450m to Nambli Bala… — more information requested, 10.9 km away
- Diversion of 0.0225 HA. of Forest Land for construction of Mobile Tower for… — lapsed, 11.3 km away
- Wss Poshker — forest land use approved, 11.6 km away
- L024-(Link) From Kachnambal Pethpora Road km 2nd Rd 600m to Nard Basti Package… — not approved, 13.6 km away
- River Bed Mining project of Minor Mineral at Wussan Bridge to chinar Upstream… — lapsed, 15.6 km away
- Construction of Kral Khainey Hayan Road Under NABARD RIDF XXIX — forest land use approved, 16.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.