Quick answers
What is this project?
Construction and maintenance of Road from L039-(Link Road) PWD Road Kawna To Buzla, Package No. JK19-4004, PMGSY-IV Batch-I of 2025-26, Block- Khari , District Ramban Length- 6.000 kms is a proposed road project in Khari, Banihal, Ramban, Jammu and Kashmir. The site covers 33.8 acres.
Who is building it?
The applicant is PMGSY DIVISION Banihal.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Khari, Banihal, Ramban, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹18.6 crore; a site of 33.8 acres and 1.5 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 3 Aug 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 11 Oct 2026 |
| Application filed | 3 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | PMGSY DIVISION Banihal |
| Land area | 33.8 acres (13.7 ha) |
| Forest land | 1.5 acres (0.6 ha) |
| Project cost | ₹18.6 crore |
| Village / locality | Khari |
| Taluk / tehsil | Banihal |
| District | Ramban |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00607 |
In context
57 applications in Ramban since January 2022 are in the same category (Roads & highways): 4 approved, 35 filed or under review, and 18 withdrawn, lapsed or rejected. At 33.8 acres, this one is larger than 88% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Khari, Banihal, Ramban, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Improvement/Upgradation of Road from PMGSY Trigam Road to HS Buzla — in-principle approval, conditions pending, 150 m away
- 4G Saturation Project Buzla — forest land use approved, 250 m away
- Kawna to Wagalwass Sarachi road Length = 4.10 Km (Under NABARD RIDF-XXIX) — initial checks, 2.1 km away
- 4G Saturation Project Bawa — forest land use approved, 2.3 km away
- Retrofitting of Water Supply Scheme Trigam — forest land use approved, 2.7 km away
- 4G Saturation Project Sarachi — forest land use approved, 3.3 km away
- Retrofitting of Water Supply Scheme Maho Mangit — forest land use approved, 3.7 km away
- Retrofitting of Water Supply Scheme Khari — forest land use approved, 5.1 km away
More from PMGSY DIVISION Banihal in Ramban
- Construction and maintenance of Road from L031-(Link Road) Dhanmasta to… — under forest review
- Construction and maintenance of Road from L032-(Link Road) Khari to Kundan,… — more information requested
- Construction and maintenance of Road from L033-(Link Road) Magerkote to… — more information requested
- Construction and maintenance of Road from L033-Link Road from PMGSY Road… — more information requested
- Construction and maintenance of Road from L034-(Link Road) PMGSY Road Bhingara… — more information requested
- Construction and Maintenance of Road from L039-Link road from NH44 Ramsoo to… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.