Quick answers
What is Retrofitting of WSS Dalwah Lower?
Retrofitting of WSS Dalwah Lower is an approved pipeline project in Dalwah, Ramban, Jammu and Kashmir. The site covers 0.1 acres.
Who is building it?
The applicant is Jal Shakti Department (Hydraulic Division Ramban).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 17 Apr 2026), as of 27 Nov 2026.
Where is it?
In Dalwah, Ramban, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹1.6 crore; a site of 0.1 acres and 610 m² of forest land.
When was it filed?
The application was filed on 11 Feb 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 17 Apr 2026 |
| Application filed | 11 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Jal Shakti Department (Hydraulic Division Ramban) |
| Land area | 600 m² |
| Forest land | 610 m² |
| Project cost | ₹1.6 crore |
| Village / locality | Dalwah |
| Taluk / tehsil | Ramban |
| District | Ramban |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00796 |
In context
8 applications in Ramban since January 2022 are in the same category (Pipelines): 6 approved, 0 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3.2 years from filing to approval.
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dalwah, Ramban, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Improvement of Dutter Khul under UT Capex — forest land use approved, 650 m away
- Improvement of Dutter Khul under UT Capex — lapsed, 650 m away
- Improvement of Dutter Khul under UT Capex — lapsed, 650 m away
- 4G Saturation Project Manglogi — forest land use approved, 1 km away
- Retrofitting of WSS Dalwah Upper — forest land use approved, 1.4 km away
- Construction of link road from Gool Jabbar (Tungwali) to Gujjar Gali. — more information requested, 1.7 km away
- Retrofitting of Water Supply Scheme Dharam — forest land use approved, 1.8 km away
- Retrofitting of Water Supply Scheme Dharam (Additional Land Required) — in-principle approval, conditions pending, 2.3 km away
More from Jal Shakti Department (Hydraulic Division Ramban) in Ramban
- Water Supply Scheme Maho Mangit — lapsed
- Water Supply Scheme Baroon Batote under JJM — forest land use approved
- Water Supply Scheme Dalgote — lapsed
- Water Supply Scheme Balwat — forest land use approved
- Retrofitting of Water Supply Scheme Ludwal Kotli (Leftout) under JJM — forest land use approved
- Retrofitting of Water Supply Scheme Rajgarh (Additional Land Required) — forest land use approved
106 Jal Shakti Department, Jammu and Kashmir projects in Ramban
All 1,350 Jal Shakti Department, Jammu and Kashmir projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.