Project details
| Status | Lapsed |
|---|---|
| Status since | 23 Apr 2026 |
| Application filed | 17 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | The Jammu and Kashmir Bank Limited |
| Forest land | 10 m² |
| Project cost | ₹3 lakh |
| Village / locality | Ramgarh |
| Taluk / tehsil | Doda |
| District | Doda |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00851 |
In context
9 applications in Doda since January 2022 are in the same category (Other): 1 approved, 0 filed or under review, and 8 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ramgarh, Doda, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Water Supply Scheme Ramgarh — forest land use approved, 4.4 km away
- Water Supply Scheme Ramgarh — lapsed, 4.4 km away
- Road ,take off from Assar to Thandapani ,Nagwas to Patta under NABARD XXVI — more information requested, 5.7 km away
- Water Supply Scheme Chirota — forest land use approved, 5.9 km away
- Water Supply Scheme Chirota — lapsed, 5.9 km away
- Construction and Maintenance of road from L054-(link road) KM 28th RD200… — more information requested, 6.2 km away
- Water Supply Scheme Assar — forest land use approved, 6.9 km away
- Water Supply Scheme Assar — lapsed, 6.9 km away
All 5 The Jammu and Kashmir Bank projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.