Project details
| Status | Forest land use approved |
|---|---|
| Status since | 30 May 2025 |
| Application filed | 3 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 230 m² |
| Project cost | ₹24 lakh |
| Village / locality | Lathery |
| Taluk / tehsil | Akhnoor |
| District | Jammu |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00922 |
In context
19 applications in Jammu since January 2022 are in the same category (Telecom): 7 approved, 9 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 13 months from filing to approval. At 0 acres, this one is smaller than 89% of them.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lathery, Akhnoor, Jammu, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Minor Mineral (River Bed Material) Mining Project, Block No. 5/36 over an… — environmental approval granted, 1.7 km away
- Construction and Maintenance of Road from L021-(Link Route) Jothal Road to… — more information requested, 1.9 km away
- Retrofitting of WSS Kieur-II — forest land use approved, 2.1 km away
- Minor Mineral (River Bed Material) Mining Project, Block-38 (5/13), Area of… — environmental approval granted, 2.7 km away
- 4G Saturation Project Gour Bojurian — forest land use approved, 3.5 km away
- Minor Mineral (River Bed Material) Mining Project, Block No. 5/11 over an… — environmental approval granted, 3.7 km away
- RBM (River Bed Material), Block-5/11 an area of 8.59 ha; Khatharwalli Khad… — lapsed, 3.7 km away
- Retrofitting of WSS Chagyal — more information requested, 3.8 km away
More from Mahesh Nair in Jammu
- 4G Saturation Project at Village Pukharni — more information requested
- 4G Saturation Project Village Neeli Nallah — more information requested
- 4G Saturation Project at Village Saryala — more information requested
- 4G Saturation Project Kangrail — forest land use approved
- 4G Saturation Project Kangrail — decision issued
- 4G Saturation Project Kalah — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.