Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Feb 2025 |
| Application filed | 12 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Executive Engineer Jpdcl Sub Transmission Division No 1 Jammu |
| Land area | 1.3 acres (0.5 ha) |
| Forest land | 1.3 acres (0.5 ha) |
| Project cost | ₹8.4 crore |
| Village / locality | Surinsar |
| Taluk / tehsil | Jammu |
| District | Jammu |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-00990 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Sept 2023 | More information requested | 1.3 acres | ₹8.4 crore |
| New project filed 12 Sept 2023 (this page) | Lapsed | 1.3 acres | ₹8.4 crore |
In context
11 applications in Jammu since January 2022 are in the same category (Power): 2 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. At 1.3 acres, this one is smaller than 100% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Surinsar, Jammu, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- System Improvement Scheme for Construction of New 3.15 MVA 33/11 KV Receiving… — lapsed, 750 m away
- System Improvement Scheme for Construction of New 3.15 MVA 33/11 KV Receiving… — under wildlife review, 750 m away
- Improvement/Augmentation of Water Supply Scheme for Bargha Taryar — forest land use approved, 1.1 km away
- Improvement/Augmentation of Water Supply Scheme for Bargha Taryar — decision issued, 1.1 km away
- Power System Improvement by Way of Construction of New 33/11 KV 3.15 Mva… — more information requested, 1.6 km away
- Challana to Balad Road — more information requested, 2.1 km away
- Challana to Balad Road — decision issued, 2.1 km away
- 30 Meter Span Rcc Bridge & Taryad to Pathwar Road — decision issued, 2.7 km away
More from Executive Engineer Jpdcl Sub Transmission Division No 1 Jammu in Jammu
- System Improvement Scheme for Construction of New 3.15 MVA 33/11 KV Receiving… — lapsed
- System Improvement Scheme for Construction of New 3.15 MVA 33/11 KV Receiving… — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.