Quick answers
What is Construction of Tractor Road From Ladkhati to Sarbagni?
Construction of Tractor Road From Ladkhati to Sarbagni is a lapsed road project in Sarbhangni, Banihal, Ramban, Jammu and Kashmir. The site covers 1.3 acres.
Who is building it?
The applicant is Rural Development.
Has it been approved?
No. The application was lapsed on 14 May 2024, so it is no longer under consideration.
Where is it?
In Sarbhangni, Banihal, Ramban, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹33 lakh; a site of 1.3 acres and 1.3 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 18 Jan 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 14 May 2024 |
| Application filed | 18 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Rural Development |
| Land area | 1.3 acres (0.5 ha) |
| Forest land | 1.3 acres (0.5 ha) |
| Project cost | ₹33 lakh |
| Village / locality | Sarbhangni |
| Taluk / tehsil | Banihal |
| District | Ramban |
| State | Jammu and Kashmir |
| Location from | Site area on record |
| Our reference | WID-JK-01133 |
In context
57 applications in Ramban since January 2022 are in the same category (Roads & highways): 4 approved, 35 filed or under review, and 18 withdrawn, lapsed or rejected. At 1.3 acres, this one is smaller than 91% of them.
26 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarbhangni, Banihal, Ramban, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction and Maintenance of Road from L039-Link road from NH44 Ramsoo to… — more information requested, 350 m away
- 4G Saturation Project Ramsoo — forest land use approved, 550 m away
- Construction and Maintenance of Road from L039-Link road from NH44 Ramsoo to… — lapsed, 550 m away
- Banihal/Ramban-Banihal-UG to OH — lapsed, 1.2 km away
- Laying of Over Head Optical Fiber Cable From Ramsoo to Neel Road Near Makarkot… — lapsed, 1.3 km away
- Construction of Tractor Road From Sethli to Zandara — forest land use approved, 1.5 km away
- Constt of Tractor Road Sumo Stand to Upper Wani Mohalla — lapsed, 1.6 km away
- Road from Khoni Nallah Guffa morh to Kralna under NABARD RIDF XXVIII — forest land use approved, 1.7 km away
More from Rural Development in Ramban
- Constt of Tractor Road Sumo Stand to Upper Wani Mohalla — lapsed
- Construction of Tractor Road From Sethli to Zandara — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.