Project details
| Status | Under forest review |
|---|---|
| Status since | 15 Nov 2026 |
| Application filed | 18 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer PMGSY Division Budgam |
| Land area | 9.8 acres (4 ha) |
| Forest land | 2 acres (0.8 ha) |
| Project cost | ₹8.7 crore |
| Village / locality | Lainilab |
| Taluk / tehsil | Khansahib |
| District | Badgam |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-01287 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 18 Sept 2026 (this page) | Under forest review | 9.8 acres | ₹8.7 crore |
| New project filed 1 Jun 2026 | Lapsed | 9.8 acres | ₹8.7 crore |
In context
19 applications in Badgam since January 2022 are in the same category (Roads & highways): 0 approved, 10 filed or under review, and 9 withdrawn, lapsed or rejected. At 9.8 acres, this one is larger than 79% of them.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lainilab, Khansahib, Badgam, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Construction and Maintenance of road from L056-(Link Road) Gurwait Pahnar Road… — lapsed, 0 m away
- Sheikh ul Alam Mehjoor Shamsfaqeer — lapsed, 1.4 km away
- Sheikh ul Alam Mehjoor Shamsfaqeer — forest land use approved, 1.4 km away
- Construction and maintenance of L049-(Link Road) L031 Km 8th RD 700 to… — under forest review, 2.1 km away
- Construction and maintenance of L049-(Link Road) L031 Km 8th RD 700 to… — lapsed, 2.1 km away
- ARIZAL Zampora — lapsed, 2.7 km away
- ARIZAL Zampora — forest land use approved, 2.7 km away
- Alamdar Doodpathri — forest land use approved, 3.1 km away
More from Executive Engineer PMGSY Division Budgam in Badgam
- Construction and Maintenance of Road from L054-(Link Road) L031 Km 6th to… — under forest review
- Construction and maintenance of L049-(Link Road) L031 Km 8th RD 700 to… — under forest review
- Construction and Maintenance of L053-(Link Road) L09 Katyali to Dobri Konzabal… — under forest review
- Construction and Maintenance of Road from L054 - (Link Road) L031 Km 6th to… — lapsed
- Construction and Maintenance of Link Road From L09 Katyali to Dobri Konzabal… — lapsed
- Construction and maintenance of L049-(Link Road) L031 Km 8th RD 700 to… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.