Quick answers
What is Installation of Tower at Atoli (Sazar)?
Installation of Tower at Atoli (Sazar) is a lapsed telecom project in Sazar, Atholi (Paddar), Kishtwar, Jammu and Kashmir. The site covers 0 acres.
Who is building it?
The applicant is Khalid Bhat.
Has it been approved?
No. The application was lapsed on 2 Oct 2023, so it is no longer under consideration.
Where is it?
In Sazar, Atholi (Paddar), Kishtwar, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹10 lakh; a site of 0 acres and 100 m² of forest land.
When was it filed?
The application was filed on 11 Jun 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 2 Oct 2023 |
| Application filed | 11 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Khalid Bhat |
| Land area | 100 m² |
| Forest land | 100 m² |
| Project cost | ₹10 lakh |
| Village / locality | Sazar |
| Taluk / tehsil | Atholi (Paddar) |
| District | Kishtwar |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-01644 |
In context
12 applications in Kishtwar since January 2022 are in the same category (Telecom): 3 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sazar, Atholi (Paddar), Kishtwar, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- WSS Jar — forest land use approved, 3.6 km away
- Kirthai-II Hydroelectric Project — cleared for impact study, 5.8 km away
- Kirthai-II Hydroelectric Project — more information requested, 5.8 km away
- WSS Piyas — forest land use approved, 7.4 km away
- WSS Chicha — forest land use approved, 7.9 km away
- Laying of New 11 KV Line for Providing Grid Connectivity to the Un-Electrified… — lapsed, 8.3 km away
- WSS Affani — forest land use approved, 9.1 km away
- Mobile Tower at Padder (Pandail) — lapsed, 10 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.