Under forest reviewRoads & highways · Bandipore, Jammu and Kashmir

Construction and Maintenance of road from L021-(Link Road) L03 to Checki Jurniyal JK15-4006

Construction and Maintenance of road from L021-(Link Road) L03 to Checki Jurniyal JK15-4006 is a proposed road project in Jurniyal, Gurez, Bandipore, Jammu and Kashmir. The site covers 8.5 acres. Its stated project cost is ₹11.8 crore. As of 27 Nov 2026, its status is “Under forest review” (since 14 Nov 2026).

See it on the live map All projects in Bandipore

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Construction and Maintenance of road from L021-(Link Road) L03 to Checki Jurniyal JK15-4006 is a proposed road project in Jurniyal, Gurez, Bandipore, Jammu and Kashmir. The site covers 8.5 acres.

Who is building it?

The applicant is Chief Engineer PMGSY,Kashmir.

Has it been approved?

Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.

Where is it?

In Jurniyal, Gurez, Bandipore, Jammu and Kashmir.

How big is it?

It has a stated cost of ₹11.8 crore; a site of 8.5 acres and 3.4 acres (1.4 ha) of forest land.

When was it filed?

The application was filed on 28 Jul 2026.

Project details

StatusUnder forest review
Status since14 Nov 2026
Application filed28 Jul 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantChief Engineer PMGSY,Kashmir
Land area8.5 acres (3.4 ha)
Forest land3.4 acres (1.4 ha)
Project cost₹11.8 crore
Village / localityJurniyal
Taluk / tehsilGurez
DistrictBandipore
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-01646

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 19 Nov 2026Initial checks40.1 acres₹11.8 crore
New project filed 28 Jul 2026 (this page)Under forest review8.5 acres₹11.8 crore

In context

9 applications in Bandipore since January 2022 are in the same category (Roads & highways): 0 approved, 8 filed or under review, and 1 withdrawn, lapsed or rejected.

7 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Jurniyal, Gurez, Bandipore, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Chief Engineer PMGSY,Kashmir in Bandipore

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.