Project details
| Status | Under forest review |
|---|---|
| Status since | 13 Nov 2026 |
| Application filed | 9 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer Pmgsy Division Rajouri |
| Land area | 364.6 acres (147.5 ha) |
| Forest land | 2.2 acres (0.9 ha) |
| Project cost | ₹10.4 crore |
| Village / locality | Sialsui |
| Taluk / tehsil | Kalakote |
| District | Rajouri |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-01689 |
In context
55 applications in Rajouri since January 2022 are in the same category (Roads & highways): 2 approved, 42 filed or under review, and 11 withdrawn, lapsed or rejected. At 364.6 acres, this one is larger than 89% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sialsui, Kalakote, Rajouri, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Constuction of Road From Bergalla to Kakugalla Via Rainbari — more information requested, 2 km away
- WSS Tatapani — forest land use approved, 2.1 km away
- Construction of Road From Bergalla to Kakugalla Via Rainbari — lapsed, 2.2 km away
- WSS Pichli Dhar — forest land use approved, 3.1 km away
- WSS Marote — forest land use approved, 3.7 km away
- WSS Silla Marote — lapsed, 3.7 km away
- WSS Broh JJM — lapsed, 4.2 km away
- WSS Nambal Panda JJM — lapsed, 4.6 km away
More from Executive Engineer Pmgsy Division Rajouri in Rajouri
- L039_Link_Road_Steel_Bridge_Solki_to_Braggi_Via_Kikkar_Mohalla_Road — more information requested
- L021-Km 6th RD 575 of Rajdhani Paryal Road to Dartan (Link Road) — under forest review
- Link Route from L023 - Chowki Padder to Aella Length = 2.010 KM — more information requested
- Construction of Road from L037-TRALLA JAGIR TO CHAKLI (Link Road). — under forest review
- Road From L037 Link Road Lam Bro Road to Ranjali (Link Road) Length = 8.000 Km — under forest review
- Link Road from L035 Shri Baba Naar Singh Dev Sthan to Vaishno Mata Mandir… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.