Quick answers
What is Link Road from L049 Sambole to Basha, Length = 2.700 KM?
Link Road from L049 Sambole to Basha, Length = 2.700 KM is a proposed road project in Kuchal, Chhatroo, Kishtwar, Jammu and Kashmir. The site covers 4.4 acres.
Who is building it?
The applicant is Chief Engineer Pmgsy Jammu.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Kuchal, Chhatroo, Kishtwar, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹8 crore; a site of 4.4 acres and 1.3 acres (0.5 ha) of forest land.
When was it filed?
The application was filed on 9 Aug 2026.
Project details
| Official title | Construction of Link Road from L049 Sambole to Basha, Length = 2.700 KM |
|---|---|
| Status | More information requested |
| Status since | 17 Nov 2026 |
| Application filed | 9 Aug 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Chief Engineer Pmgsy Jammu |
| Land area | 4.4 acres (1.8 ha) |
| Forest land | 1.3 acres (0.5 ha) |
| Project cost | ₹8 crore |
| Village / locality | Kuchal |
| Taluk / tehsil | Chhatroo |
| District | Kishtwar |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-01830 |
In context
24 applications in Kishtwar since January 2022 are in the same category (Roads & highways): 1 approved, 17 filed or under review, and 6 withdrawn, lapsed or rejected. At 4.4 acres, this one is smaller than 75% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kuchal, Chhatroo, Kishtwar, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- WSS Rahal Thal — forest land use approved, 900 m away
- Thal Kwath Link Road Km 10th to Km 12th RD(500) Under NABARD RIDF-XXX — more information requested, 2.2 km away
- Link Road from L029 - PWD Road Thalkwath KM 8th RD 800 to Chass Road, Length =… — more information requested, 2.6 km away
- WSS Kuchal — forest land use approved, 2.7 km away
- WSS Loidhar — forest land use approved, 5.5 km away
- Link road from Batwari to Shree Km 1st to Km 3rd Phase 1st — lapsed, 5.6 km away
- WSS Belapar — forest land use approved, 5.6 km away
- Link Road from L028 Guzzer Pull to Banipora Road, Length = 9.700 KM — more information requested, 5.8 km away
More from Chief Engineer Pmgsy Jammu in Kishtwar
- Link Road from L029 - Halipad Road km 2nd Rd 500 to Kralpora Road, Length =… — under forest review
- Link Road from L028 Guzzer Pull to Banipora Road, Length = 9.700 KM — more information requested
- Link Road from L026 Batwari to Urigarh, Length = 2.300 KM — lapsed
- Link Road from L029 - PWD Road Thalkwath KM 8th RD 800 to Chass Road, Length =… — more information requested
- Link Road from L067 - PWD Road KM 2nd RD 050 to Sewa Road, Length = 1.700 KM — under forest review
- Link Road from L025 Deller to Dichher Road, Length = 5.100 km — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.