Quick answers
What is this project?
Batching Plant CP-30 Construction of Tunnel T-15, Part Tunnel T-14 including Bridge No.61 on Katra- Banihal section of USBRL, Project (J&K) (Package T-15) is a lapsed road project in Ind, Ramban, Jammu and Kashmir. The site covers 0.2 acres.
Who is building it?
The applicant is M/S Age Patel Jv.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Ind, Ramban, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹42 lakh; a site of 0.2 acres and 100 m² of forest land.
Project details
| Official title | Installation of Batching Plant CP-30 Construction of Tunnel T-15, Part Tunnel T-14 including Bridge No.61 on Katra- Banihal section of USBRL, Project (J&K) (Package T-15) |
|---|---|
| Status | Lapsed |
| Status since | 18 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | M/S Age Patel Jv |
| Land area | 900 m² |
| Forest land | 100 m² |
| Project cost | ₹42 lakh |
| Village / locality | Ind |
| Taluk / tehsil | Ramban |
| District | Ramban |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02247 |
In context
57 applications in Ramban since January 2022 are in the same category (Roads & highways): 4 approved, 35 filed or under review, and 18 withdrawn, lapsed or rejected. At 0.2 acres, this one is smaller than 100% of them.
10 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ind, Ramban, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation Project Sarlibagi — forest land use approved, 2 km away
- 4G Saturation Project Maha Kund — forest land use approved, 2.9 km away
- 4G Saturation Project Dehdah — forest land use approved, 3.4 km away
- Retrofitting of Water Supply Scheme Ind — forest land use approved, 3.4 km away
- Retrofitting of Water Supply Scheme Dhedah — forest land use approved, 4.1 km away
- 4G Saturation Project Lower Dalwah — forest land use approved, 4.1 km away
- 4G Saturation Project Bralla — lapsed, 4.3 km away
- Construction of link road from Gool Jabbar (Tungwali) to Gujjar Gali. — more information requested, 4.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.