What is Chatru-Prawra Hydro Electric Power Station?
Chatru-Prawra Hydro Electric Power Station is a proposed water and irrigation project in Sigdee, Chhatroo, Kishtwar, Jammu and Kashmir. The site covers 7.4 acres.
Who is building it?
The applicant is Jammu and Kashmir Energy Development Agency (Jakeda), S&t Deptt. J&k.
Has it been approved?
Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.
Where is it?
In Sigdee, Chhatroo, Kishtwar, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹24 crore; a site of 7.4 acres and 6.4 acres (2.6 ha) of forest land.
When was it filed?
The application was filed on 7 Jul 2025.
Project details
| Status | Under forest review |
|---|---|
| Status since | 16 Sept 2026 |
| Application filed | 7 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Jammu and Kashmir Energy Development Agency (Jakeda), S&t Deptt. J&k |
| Land area | 7.4 acres (3 ha) |
| Forest land | 6.4 acres (2.6 ha) |
| Project cost | ₹24 crore |
| Village / locality | Sigdee |
| Taluk / tehsil | Chhatroo |
| District | Kishtwar |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02358 |
In context
109 applications in Kishtwar since January 2022 are in the same category (Water & irrigation): 97 approved, 10 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 3.0 years from filing to approval. At 7.4 acres, this one is larger than 94% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sigdee, Chhatroo, Kishtwar, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- WSS Gugnar Zaran — forest land use approved, 1.3 km away
- WSS Hangrina Waithana — forest land use approved, 1.9 km away
- WSS Sigdi Nar — forest land use approved, 3.3 km away
- WSS Sigdi Shri — forest land use approved, 3.6 km away
- WSS Tagood — forest land use approved, 3.8 km away
- Lower Palmar-B — forest land use approved, 4.6 km away
- WSS Upper Palmar — forest land use approved, 4.8 km away
- Link road from Batwari to Shree Km 1st to Km 3rd Phase 1st — lapsed, 5 km away
More from Jammu and Kashmir Energy Development Agency (Jakeda), S&t Deptt. J&k in Kishtwar
- 2.00 MW MHP Mullar — more information requested
All 11 Jammu and Kashmir projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.