Quick answers
What is Retrofitting Of Water Supply Scheme Sumber Upper A?
Retrofitting Of Water Supply Scheme Sumber Upper A is an approved water and irrigation project in Sonmbar Barhog, Ramban, Jammu and Kashmir. The site covers 0.2 acres.
Who is building it?
The applicant is Jal Shakti Department (Hydraulic Division Ramban).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 17 Apr 2026), as of 27 Nov 2026.
Where is it?
In Sonmbar Barhog, Ramban, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹71 lakh; a site of 0.2 acres and 740 m² of forest land.
When was it filed?
The application was filed on 20 Jun 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 17 Apr 2026 |
| Application filed | 20 Jun 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Jal Shakti Department (Hydraulic Division Ramban) |
| Land area | 700 m² |
| Forest land | 740 m² |
| Project cost | ₹71 lakh |
| Village / locality | Sonmbar Barhog |
| Taluk / tehsil | Ramban |
| District | Ramban |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02681 |
In context
100 applications in Ramban since January 2022 are in the same category (Water & irrigation): 87 approved, 8 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 0.2 acres, this one is smaller than 83% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sonmbar Barhog, Ramban, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- L102-(Link road) Gamnaog to Nakka via Jawari — more information requested, 650 m away
- 4G Saturation Project Jawari — forest land use approved, 1.3 km away
- L090-(Link road) Maghdar to Muranch via Nalli — more information requested, 2.2 km away
- Water Supply Scheme Sumber Upper-A — lapsed, 2.3 km away
- Retrofitting of Water Supply Scheme Hella Dharam — forest land use approved, 3.6 km away
- 4G Saturation Project Haila — forest land use approved, 4 km away
- Minor Mineral Block Gypsum Mining — under environmental review, 4.4 km away
- Minor Mineral Block Gypsum Mining — environmental approval granted, 4.4 km away
More from Jal Shakti Department (Hydraulic Division Ramban) in Ramban
- Water Supply Scheme Maho Mangit — lapsed
- Water Supply Scheme Baroon Batote under JJM — forest land use approved
- Water Supply Scheme Dalgote — lapsed
- Water Supply Scheme Balwat — forest land use approved
- Retrofitting of Water Supply Scheme Ludwal Kotli (Leftout) under JJM — forest land use approved
- Retrofitting of Water Supply Scheme Rajgarh (Additional Land Required) — forest land use approved
106 Jal Shakti Department, Jammu and Kashmir projects in Ramban
All 1,350 Jal Shakti Department, Jammu and Kashmir projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.