Quick answers
What is Retrofitting of Water Supply Scheme Changloo?
Retrofitting of Water Supply Scheme Changloo is an approved water and irrigation project in Chanchloo, Banihal, Ramban, Jammu and Kashmir. The site covers 0.2 acres.
Who is building it?
The applicant is Jal Shakti Department (Hydraulic Division Ramban).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 17 Apr 2026), as of 27 Nov 2026.
Where is it?
In Chanchloo, Banihal, Ramban, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹5.4 crore; a site of 0.2 acres and 870 m² of forest land.
When was it filed?
The application was filed on 26 Apr 2023.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 17 Apr 2026 |
| Application filed | 26 Apr 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Jal Shakti Department (Hydraulic Division Ramban) |
| Land area | 900 m² |
| Forest land | 870 m² |
| Project cost | ₹5.4 crore |
| Village / locality | Chanchloo |
| Taluk / tehsil | Banihal |
| District | Ramban |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02689 |
In context
100 applications in Ramban since January 2022 are in the same category (Water & irrigation): 87 approved, 8 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2.9 years from filing to approval. At 0.2 acres, this one is smaller than 81% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chanchloo, Banihal, Ramban, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation Project Chanchloo — forest land use approved, 550 m away
- 4G Saturation Project Darshipora — forest land use approved, 2 km away
- Retrofitting of WSS Chareel Darshipura — forest land use approved, 2.2 km away
- 4G Saturation Project Phagowonkote — forest land use approved, 3.5 km away
- Retrofitting of Water Supply Scheme Duligam — more information requested, 3.7 km away
- 4G Saturation Project Kharpora — forest land use approved, 4.5 km away
- 4G Saturation Project Chachihal — forest land use approved, 4.7 km away
- 4G Saturation Project Lamber — forest land use approved, 4.7 km away
More from Jal Shakti Department (Hydraulic Division Ramban) in Ramban
- Water Supply Scheme Maho Mangit — lapsed
- Water Supply Scheme Baroon Batote under JJM — forest land use approved
- Water Supply Scheme Dalgote — lapsed
- Water Supply Scheme Balwat — forest land use approved
- Retrofitting of Water Supply Scheme Ludwal Kotli (Leftout) under JJM — forest land use approved
- Retrofitting of Water Supply Scheme Rajgarh (Additional Land Required) — forest land use approved
106 Jal Shakti Department, Jammu and Kashmir projects in Ramban
All 1,350 Jal Shakti Department, Jammu and Kashmir projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.