Quick answers
What is this project?
Provding Water Supply Facility to Integrated Development of Toursit at Mantalai Under Pmdp is a lapsed water and irrigation project in Bashti, Chenani, Udhampur, Jammu and Kashmir. The site covers 2.1 acres.
Who is building it?
The applicant is Executive Engineer Phe Division Udhampur.
Has it been approved?
No. The application was lapsed on 26 Nov 2023, so it is no longer under consideration.
Where is it?
In Bashti, Chenani, Udhampur, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹46 lakh; a site of 2.1 acres and 430 m² of forest land.
When was it filed?
The application was filed on 1 Mar 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Nov 2023 |
| Application filed | 1 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Executive Engineer Phe Division Udhampur |
| Land area | 2.1 acres (0.9 ha) |
| Forest land | 430 m² |
| Project cost | ₹46 lakh |
| Village / locality | Bashti |
| Taluk / tehsil | Chenani |
| District | Udhampur |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02719 |
In context
145 applications in Udhampur since January 2022 are in the same category (Water & irrigation): 112 approved, 15 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 2.1 acres, this one is larger than 85% of them.
20 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bashti, Chenani, Udhampur, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Providing Water Supply Facility to Integrated Development of Tourist Facility… — application filed, 0 m away
- 4G Saturation Project Kossar — lapsed, 800 m away
- 4G Saturation Project - Kossar — more information requested, 800 m away
- 4G Saturation Project KOSSAR — lapsed, 800 m away
- 4g Saturation Project Kossar — lapsed, 800 m away
- 4g Saturation Project Kossar — more information requested, 800 m away
- 4G Saturation Project KOSSAR — more information requested, 800 m away
- 4G Saturation Project Kossar — under wildlife review, 800 m away
More from Executive Engineer Phe Division Udhampur in Udhampur
- Providing Water Supply Facility to Integrated Development of Tourist Facility… — application filed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.