One of 2 filings for this project. The project's main page, with every filing and where each stands: Const. of Road from Odha to Goran
Project details
| Status | Lapsed |
|---|---|
| Status since | 30 Dec 2025 |
| Application filed | 16 Mar 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Xen Pwd (Samba) |
| Land area | 3.7 acres (1.5 ha) |
| Forest land | 1.4 acres (0.6 ha) |
| Project cost | ₹2.5 crore |
| Village / locality | Goran |
| Taluk / tehsil | Samba |
| District | Samba |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-02945 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Jun 2023 | Lapsed | 3.7 acres | ₹2.5 crore |
| New project filed 16 Mar 2023 (this page) | Lapsed | 3.7 acres | ₹2.5 crore |
In context
20 applications in Samba since January 2022 are in the same category (Roads & highways): 2 approved, 11 filed or under review, and 7 withdrawn, lapsed or rejected. At 3.7 acres, this one is smaller than 60% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Goran, Samba, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Const. of Road from Odha to Goran — lapsed, 0 m away
- 4G Saturation Project Babeti — forest land use approved, 4.5 km away
- river Bed mining project at Block no 4/1,Bein River Upstream NH1A bridge ,Samba — environmental approval granted, 5.7 km away
- Construction and Maintenance of Road from L021(Link Route) Sodam to Sanour via… — lapsed, 5.9 km away
- Construction and Maintenance of road from L021 (Link Route) Sodam to Sanour… — under forest review, 6.1 km away
- Minor Mineral River Bed Material Mining Project, Block-4/2 Area: 9.57 ha. — lapsed, 6.8 km away
- Diversion of 0.0225 HA. of Forest Land for construction of Mobile Tower for… — lapsed, 7.8 km away
- Minor Mineral RBM (River Bed Material), Block- 4/3 area-9.90 ha. at Bein River… — environmental approval granted, 7.9 km away
More from Xen Pwd (Samba) in Samba
- Link road from Chilla Danga to Gujjar Nali under NABARD (length = 2.00 km ) — initial checks
- Construction of Link Road From Lunkia Pani to Lian (Samba) — more information requested
- Const. of Link Road from Chilla Danga to Gujjar Nalli under NABARD (Length =… — more information requested
- ROAD FROM LUNKIA PANI TO LIAN road (Forest Division Jammu) — more information requested
- Construction of Road From Lunkia Pani to Lian Road Samba — lapsed
- Const. of Road From Purmandal Road to Kathar Via Upper Sangar Road — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.