Project details
| Status | Forest land use approved |
|---|---|
| Status since | 9 Oct 2024 |
| Application filed | 6 Oct 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹24 lakh |
| Village / locality | Haipora |
| Taluk / tehsil | Tangmarg |
| District | Baramula |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-03027 |
In context
10 applications in Baramula since January 2022 are in the same category (Telecom): 2 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Haipora, Tangmarg, Baramula, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Uso 4g Saturation — lapsed, 450 m away
- River Bed Mineral (RBM) Mining Project. Block-16, Aboora Bridge to Pandit… — lapsed, 3.2 km away
- WSS Chandil Wanigam — lapsed, 3.2 km away
- WSS Ganiwani Manchkund (Pipe Line) — forest land use approved, 3.3 km away
- WSS Ganiwani Manchkund — lapsed, 4 km away
- WSS Gund Dalwash — lapsed, 4.3 km away
- WSS Darakasi (Pipe Line) — forest land use approved, 4.8 km away
- WSS Chandil Wanigam (Pipe Line) — forest land use approved, 5 km away
More from Mahesh Nair in Baramula
- Uso 4g Saturation — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.