Quick answers
What is Geotechnical Investigations for Ujh MPP?
Geotechnical Investigations for Ujh MPP is an approved project in Parnala, Basohli, Kathua, Jammu and Kashmir.
Who is building it?
The applicant is Ee Chenab Division Cwc.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 26 Apr 2026), as of 27 Nov 2026.
Where is it?
In Parnala, Basohli, Kathua, Jammu and Kashmir.
How big is it?
It has a stated cost of ₹9 lakh.
When was it filed?
The application was filed on 4 Dec 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 26 Apr 2026 |
| Application filed | 4 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Ee Chenab Division Cwc |
| Project cost | ₹9 lakh |
| Village / locality | Parnala |
| Taluk / tehsil | Basohli |
| District | Kathua |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-03065 |
In context
23 applications in Kathua since January 2022 are in the same category (Other): 2 approved, 0 filed or under review, and 19 withdrawn, lapsed or rejected.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Parnala, Basohli, Kathua, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bridges at Km 23.09 (Khattar 21.0 M Span), Km 27.075 (Nud 30.0 M Span), Km… — in-principle approval, conditions pending, 600 m away
- Water Supply Scheme Athialta — forest land use approved, 1.3 km away
- Water Supply Scheme Nowshera — forest land use approved, 1.3 km away
- Water Supply schme Rehalta — forest land use approved, 1.8 km away
- 4G Saturation Project Jalandaei Mata (Athialta) — forest land use approved, 2.5 km away
- Water Supply Scheme Dhak Sulari — forest land use approved, 3.2 km away
- Road from L045-(Link Road) Ambughat to Bera, Length = 3.0 KM — more information requested, 3.2 km away
- Water Supply Scheme Mata Bankhandi — forest land use approved, 3.4 km away
More from Ee Chenab Division Cwc in Kathua
- Geotechnical Investigations for Ujh MPP — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.