What is Developing? Open the mapMap

More information requestedRoads & highways · Ramban, Jammu and Kashmir

Upgradation of road from MR LO1 NH244 Km 27th RD 300 Dansal to Assar via Lalhote, Bulandpur, Charrota, Package No.3008, PMGSY III Batch -I of 2022-23 Block Assar, District Doda, Length 30.200 Kms

Upgradation of road from MR LO1 NH244 Km 27th RD 300 Dansal to Assar via Lalhote, Bulandpur, Charrota, Package No.3008, PMGSY III Batch -I of 2022-23 Block Assar, District Doda, Length 30.200 Kms is a proposed road project in Forest Block, Ramban, Jammu and Kashmir. The site covers 45.8 acres. Its stated project cost is ₹39.2 crore. As of 27 Nov 2026, its status is “More information requested” (since 23 Apr 2026).

See it on the live map All projects in Ramban

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Upgradation of road from MR LO1 NH244 Km 27th RD 300 Dansal to Assar via Lalhote, Bulandpur, Charrota, Package No.3008, PMGSY III Batch -I of 2022-23 Block Assar, District Doda, Length 30.200 Kms is a proposed road project in Forest Block, Ramban, Jammu and Kashmir. The site covers 45.8 acres.

Who is building it?

The applicant is Executive Engineer (Piu) Pmgsy Division Doda.

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Forest Block, Ramban, Jammu and Kashmir.

How big is it?

It has a stated cost of ₹39.2 crore; a site of 45.8 acres and 2,000 m² of forest land.

When was it filed?

The application was filed on 20 Dec 2023.

Project details

StatusMore information requested
Status since23 Apr 2026
Application filed20 Dec 2023
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantExecutive Engineer (Piu) Pmgsy Division Doda
Land area45.8 acres (18.6 ha)
Forest land2,000 m²
Project cost₹39.2 crore
Village / localityForest Block
Taluk / tehsilRamban
DistrictRamban
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-03077

In context

57 applications in Ramban since January 2022 are in the same category (Roads & highways): 4 approved, 35 filed or under review, and 18 withdrawn, lapsed or rejected. At 45.8 acres, this one is larger than 89% of them.

Where it is

Forest Block, Ramban, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.