One of 2 filings for this project. The project's main page, with every filing and where each stands: WSS Hajibal Shalgam
Project details
| Status | More information requested |
|---|---|
| Status since | 12 Sept 2023 |
| Application filed | 12 Sept 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Jal Shakti Department |
| Land area | 1,300 m² |
| Project cost | ₹9.6 crore |
| Village / locality | Forest Block |
| Taluk / tehsil | Tangmarg |
| District | Baramula |
| State | Jammu and Kashmir |
| Location from | Site boundary on record |
| Our reference | WID-JK-03314 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 15 Oct 2023 | Forest land use approved | 0.3 acres | ₹9.6 crore |
| New project filed 12 Sept 2023 (this page) | More information requested | 0.3 acres | ₹9.6 crore |
In context
24 applications in Baramula since January 2022 are in the same category (Other): 0 approved, 7 filed or under review, and 12 withdrawn, lapsed or rejected. At 0.3 acres, this one is smaller than 74% of them.
34 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Forest Block, Tangmarg, Baramula, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- WSS Hajibal Shalgam — forest land use approved, 0 m away
- WSS Maghualpora Tantraypora (Pipe Line) — forest land use approved, 1.5 km away
- WSS Wailoo Kralpora (Pipe Line) — forest land use approved, 1.6 km away
- WSS Shagimarg Qazipora — lapsed, 1.8 km away
- WSS Shajimarg Qazipora — lapsed, 1.9 km away
- Water Supply Scheme Shajimarg Qazipora — forest land use approved, 1.9 km away
- WSS Druroo Pandithpora (Pipe Line) — forest land use approved, 2 km away
- Development of Car Parking at Tangmarg — lapsed, 2 km away
More from Jal Shakti Department in Baramula
- Botpathri Chowkidar Quarter for Watch and ward for Employees — lapsed
- Botapathri Chowkidar Quater for LINE Man — lapsed
- WSS Botapahtri under Wild Life — decision issued
- WSS Botapathri Non Linear (CQ)h — lapsed
- Botapathir Phase Ist — lapsed
- Namblan SHeeri SR — lapsed
111 Jal Shakti Department, Jammu and Kashmir projects in Baramula
All 1,350 Jal Shakti Department, Jammu and Kashmir projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.