What is Developing? Open the mapMap

Initial checksRoads & highways · Reasi, Jammu and Kashmir

Road from L154 - Link Road Jyotipuram to Power House Salal Road km 5th to Nawabad Road, Length = 7.300 km

Road from L154 - Link Road Jyotipuram to Power House Salal Road km 5th to Nawabad Road, Length = 7.300 km is a proposed road project in Salal, Reasi, Jammu and Kashmir. The site covers 11.6 acres. Its stated project cost is ₹16.1 crore. As of 27 Nov 2026, its status is “Initial checks” (since 25 Nov 2026).

See it on the live map All projects in Reasi

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleConstruction of Road from L154 - Link Road Jyotipuram to Power House Salal Road km 5th to Nawabad Road, Length = 7.300 km
StatusInitial checks
Status since25 Nov 2026
Application filed25 Nov 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantPMGSY Division Reasi
Land area11.6 acres (4.7 ha)
Forest land3.7 acres (1.5 ha)
Project cost₹16.1 crore
Village / localitySalal
Taluk / tehsilReasi
DistrictReasi
StateJammu and Kashmir
Location fromSite boundary on record
Our referenceWID-JK-03421

In context

36 applications in Reasi since January 2022 are in the same category (Roads & highways): 2 approved, 26 filed or under review, and 8 withdrawn, lapsed or rejected. At 11.6 acres, this one is larger than 65% of them.

14 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Salal, Reasi, Jammu and Kashmir. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from PMGSY Division Reasi in Reasi

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.