Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 21 Sept 2022 |
| Application filed | 21 Sept 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ramesh |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹2 lakh |
| Village / locality | Kumar Ramanakunta |
| Taluk / tehsil | Koppal |
| District | Koppal |
| State | Karnataka |
| Location from | Taluk / tehsil |
| Our reference | WID-KA-00210 |
In context
188 applications in Koppal since January 2022 are in the same category (Mining): 135 approved, 21 filed or under review, and 32 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.5 acres, this one is smaller than 86% of them.
Where it is
Kumar Ramanakunta, Koppal, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Building Stone Quarry — under environmental review, 4.4 km away
- "Ordinary Sand Quarry" OF Sri. Ramareddeppa — environmental approval granted, 5.7 km away
- Building Stone Quarry — under environmental review, 5.7 km away
- Increasing Iron Ore Pellet Production in Existing Plant From 1.2 MTPA to 1.5… — initial checks, 5.8 km away
- Increase Of Iron Ore Pellet Production in Existing Plant From 1.2 MTPA to 1.5… — initial checks, 5.8 km away
- Increase of Iron Ore Pellet Production in Existing Plant From 1.2 Mtpa to 1.5… — initial checks, 5.8 km away
- Building Stone Quarry of Sangappa B. Nagaralli — environmental approval granted, 5.8 km away
- "Ordinary Sand Quarry" OF Sri. Muregappa Honnakeri — environmental approval granted, 5.9 km away
More from Ramesh in Koppal
- Building Stone Quarry — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.