Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Nov 2023 |
| Application filed | 16 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Exide Energy Solutions Limited |
| Land area | 80 acres (32.4 ha) |
| Project cost | ₹4,500 crore |
| Village / locality | Muddenhalli |
| Taluk / tehsil | Devanahalli |
| District | Bengaluru Rural |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00235 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 16 Nov 2023 (this page) | Environmental approval granted | 80 acres | ₹4,500 crore |
| Early planning filed 10 Nov 2022 | Cleared for impact study | 80 acres | ₹4,500 crore |
In context
187 applications in Bengaluru Rural since January 2022 are in the same category (Buildings & townships): 138 approved, 29 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 80 acres, this one is larger than 83% of them.
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Muddenhalli, Devanahalli, Bengaluru Rural, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Area Development project for construction of Li-ion Cells, Modules &… — cleared for impact study, 0 m away
- Expansion in Area Development Project with Built-up area from 1,90,108 sqm to… — environmental approval granted, 0 m away
- "Project Bluebird" Manufacturing and Assembly facility for Rx Spectacle… — initial checks, 750 m away
- Proposed Product Mix Change in Existing Nano-Fertilizer Manufacturing Unit… — initial checks, 800 m away
- Proposed Product Mix Change in Existing Nano-Fertilizer Manufacturing Unit… — initial checks, 800 m away
- Proposed Product Mix Change in Existing Nano-Fertilizer Manufacturing Unit… — initial checks, 800 m away
- Modernization in Nano-fertilizer Manufacturing Plant" at Plot No. 75, KIADB… — returned to applicant, 800 m away
- Modernization in Nano-fertilizer Manufacturing Plant" at Plot No. 75, KIADB… — environmental approval granted, 800 m away
More from Exide Energy Solutions Limited in Bengaluru Rural
- Expansion in Area Development Project with Built-up area from 1,90,108 sqm to… — environmental approval granted
All 3 Exide Energy Solutions projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.