| Official title | Proposed Expansion of Sponge Iron Plant from 75 TPD to 300 TPD by upgrading DRI Kiln (from 1x75 TPD to 1x100 TPD) and adding new DRI Kilns (2x100TPD) along with 3 MW Captive Power Plant by M/s. Sri. Subramanya Sponge Iron Pvt. Ltd. |
|---|---|
| Status | Environmental approval granted |
| Status since | 19 Oct 2022 |
| Application filed | 19 Oct 2022 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Sri. Subramanya Sponge Iron PVT. LTD., |
| Land area | 14.7 acres (5.9 ha) |
| Project cost | ₹49.2 crore |
| Village / locality | Haraginadone |
| Taluk / tehsil | Ballari |
| District | Ballari |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00267 |
In context
80 applications in Ballari since January 2022 are in the same category (Industry): 45 approved, 15 filed or under review, and 20 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 14.7 acres, this one is smaller than 95% of them.
24 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Haraginadone, Ballari, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sponge Iron Unit- 62,700 TPA (2 X 95 TPD), M S Billets- 39,600 TPA by… — environmental approval granted, 300 m away
- Sponge Iron Unit- 62,700 TPA (2 X 95 TPD), M S Billets- 39,600 TPA by… — cleared for impact study, 300 m away
- Iron Ore Beneficiation Plant "M/s. Golden Line, Managing Partner: Sri. V.… — under environmental review, 500 m away
- Proposed Haraginadoni Industrial Area (Kuduthini Phase -3), Kudithini Village,… — cleared for impact study, 1.3 km away
- Proposed Haraginadoni Industrial Area(Kuduthini Phase -3) — returned to applicant, 1.3 km away
- Proposed Haraginadoni Industrial Area (Kuduthini Phase -3), Kudithini Village,… — lapsed, 1.3 km away
- "Building Stone & Murram Quarry" of Smt. M. Radha — environmental approval granted, 2.2 km away
- "Building Stone & Murram Quarry" of Smt. M. Radha — cleared for impact study, 2.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.