Quick answers
What is this project?
Expansion of Molasses Based Distillery from 30 to 300 KLPD by Using C / B Heavy Molasses / Cane Syrup for Ethanol Production is an approved industrial project in Kerur, Chikodi, Belagavi, Karnataka. The site covers 174.4 acres.
Who is building it?
The applicant is Chidanand Basaprabhu Kore Sahakari Sakkare Karkhane Niyamit, Chikkodi.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Nov 2022), as of 27 Nov 2026.
Where is it?
In Kerur, Chikodi, Belagavi, Karnataka.
How big is it?
It has a stated cost of ₹293 crore and a site of 174.4 acres.
When was it filed?
The application was filed on 5 Nov 2022.
Project details
| Official title | Expansion of Molasses Based Distillery from 30 to 300 KLPD by Using C / B Heavy Molasses / Cane Syrup for Ethanol Production along with 3 MW Electricity Generation by Chidanand Basaprabhu Kore Sahakari Sakkare Karkhane Niyamit. |
|---|---|
| Status | Environmental approval granted |
| Status since | 5 Nov 2022 |
| Application filed | 5 Nov 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Chidanand Basaprabhu Kore Sahakari Sakkare Karkhane Niyamit, Chikkodi |
| Land area | 174.4 acres (70.6 ha) |
| Project cost | ₹293 crore |
| Village / locality | Kerur |
| Taluk / tehsil | Chikodi |
| District | Belagavi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00282 |
In context
63 applications in Belagavi since January 2022 are in the same category (Industry): 35 approved, 20 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 174.4 acres, this one is larger than 79% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kerur, Chikodi, Belagavi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mahalakshmi Lift Irrigation Scheme — more information requested, 4 km away
- Mahalakshmi Lift Irrigation Scheme — initial checks, 4.1 km away
- Forest Clearance Application for Providing Water to Trees of Forest Land… — more information requested, 8.8 km away
- Building Stone Quarry — environmental approval granted, 11.2 km away
- R S Stone Crusher of R S Patil — environmental approval granted, 11.4 km away
- R S Stone Crusher of R S Patil — cleared for impact study, 11.4 km away
- Expansion of Sugar Factory from 14,000 TCD to 25,000 TCD, Cogeneration Plant… — environmental approval granted, 11.6 km away
- Expansion of Sugar Factory from 14,000 TCD to 25,000 TCD, Cogeneration Plant… — cleared for impact study, 11.6 km away