Quick answers
What is this project?
Grain-Based Distillery Plant of Capacity 60 Klpd to Produce 60 Klpd Ena and 30 Klpd Ethanol by Using Impure Spirit and Captive Power Plant of Capacity 2.5 MW by M/S Nsp Distillery PVT LTD is an approved industrial project in Badagand, Bilgi, Bagalkote, Karnataka. The site covers 10.3 acres.
Who is building it?
The applicant is Nsp Distillery PVT LTD.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 30 May 2023), as of 27 Nov 2026.
Where is it?
In Badagand, Bilgi, Bagalkote, Karnataka.
How big is it?
It has a stated cost of ₹94.6 crore and a site of 10.3 acres.
When was it filed?
The application was filed on 30 May 2023.
Project details
| Official title | Proposed Establishment of Grain-Based Distillery Plant of Capacity 60 Klpd to Produce 60 Klpd Ena and 30 Klpd Ethanol by Using Impure Spirit and Captive Power Plant of Capacity 2.5 MW by M/S Nsp Distillery PVT LTD |
|---|---|
| Status | Environmental approval granted |
| Status since | 30 May 2023 |
| Application filed | 30 May 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Nsp Distillery PVT LTD |
| Land area | 10.3 acres (4.2 ha) |
| Project cost | ₹94.6 crore |
| Village / locality | Badagand |
| Taluk / tehsil | Bilgi |
| District | Bagalkote |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00468 |
In context
61 applications in Bagalkote since January 2022 are in the same category (Industry): 39 approved, 11 filed or under review, and 11 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 10.3 acres, this one is smaller than 100% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Badagand, Bilgi, Bagalkote, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Integrated expansion of Sugar Plant from 10000 to 15000 TCD,… — environmental approval granted, 2.1 km away
- Expansion of Sugar Plant from 15000 TCD to 22500 TCD and Distillery from 200… — under environmental review, 2.1 km away
- Expansion of Sugar Plant from 15000 TCD to 22500 TCD and Distillery from 200… — cleared for impact study, 2.1 km away
- S R Patil Medical College, Hospital and Research Centre — environmental approval granted, 2.4 km away
- Kanaka Shree CC Green Belt — not approved, 11.4 km away
- Building stone Quarry over an extent of 8-00 Acres, "Sri. Basanagouda N.… — cleared for impact study, 14 km away
- Building stone Quarry "Sri. Basanagouda N. Naganagoudar" — lapsed, 14 km away
- Sri. Venkatesh Kajjidoni — cleared for impact study, 14.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.