Quick answers
What is this project?
Expansion of 120 KLPD Molasses based Distillery to 400 KLPD Distillery by using C / B heavy Molasses/ Cane Juice / Bio-syrup for Ethanol Production is a proposed industrial project in Kagwad, Belagavi, Karnataka. The site covers 145 acres.
Who is building it?
The applicant is Shiraguppi Sugar Works Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Kagwad, Belagavi, Karnataka.
How big is it?
It has a stated cost of ₹934.7 crore and a site of 145 acres.
When was it filed?
The application was filed on 20 Oct 2023.
Project details
| Official title | Expansion of 120 KLPD Molasses based Distillery to 400 KLPD Distillery by using C / B heavy Molasses/ Cane Juice / Bio-syrup for Ethanol Production along with Enhancement in Cane Crushing Capacity from 10,000 TCD to 15,000 TCD by Shiraguppi Sugar Works Ltd., located at Kagwad, Tal.: Athani, Dist.: Belagavi, Karnataka State. |
|---|---|
| Status | Returned to applicant |
| Status since | 27 Feb 2025 |
| Application filed | 20 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Shiraguppi Sugar Works Limited |
| Land area | 145 acres (58.7 ha) |
| Project cost | ₹934.7 crore |
| Village / locality | Kagwad |
| Taluk / tehsil | Kagwad |
| District | Belagavi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00523 |
In context
63 applications in Belagavi since January 2022 are in the same category (Industry): 35 approved, 20 filed or under review, and 8 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 145 acres, this one is larger than 68% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kagwad, Belagavi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of 120 KLPD Molasses based Distillery to 400 KLPD by using C / B… — environmental approval granted, 0 m away
- Shedabal Building Stone Quarry — environmental approval granted, 8.1 km away
- Expansion of Sugarcane Crushing and Expansion of Distillery Unit, Enhancement… — lapsed, 12.6 km away
- Expansion of Sugarcane Crushing and Expansion of Distillery Unit, Enhancement… — returned to applicant, 12.6 km away
- The Addition of Grain As Raw Material in Addition to C/B/Sugar Syrup Produces… — initial checks, 12.7 km away
- Expansion of Sugar Factory from 14,000 TCD to 25,000 TCD, Cogeneration Plant… — under environmental review, 20.4 km away
- Expansion of Sugar Factory from 14,000 TCD to 25,000 TCD, Cogeneration Plant… — under environmental review, 20.4 km away
- Expansion Of Sugar Plant Capacity From 10,000 Tcd To 12,000 Tcd by Shivashakti… — environmental approval granted, 20.5 km away
More from Shiraguppi Sugar Works Limited in Belagavi
- Expansion of 120 KLPD Molasses based Distillery to 400 KLPD by using C / B… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.