Quick answers
What is this project?
Proposed Integrated Cement Plant - Clinker (3.3 Million TPA), Cement (3 Million TPA), CPP (27 MW), WHRS (15 MW) and D.G. Set (1000 KVA) at Villages: Hosahalli and Sedam, Taluka: Sedam, District: Kalaburagi, Karnataka by M/s. Dalmia Cement (Bharat) Ltd is a withdrawn industrial project in Hosahalli, Sedam, Kalaburagi, Karnataka. The site covers 296.5 acres.
Who is building it?
The applicant is Dalmia Cement Bharat Limited.
Has it been approved?
No. The application was withdrawn on 23 Nov 2023, so it is no longer under consideration.
Where is it?
In Hosahalli, Sedam, Kalaburagi, Karnataka.
How big is it?
It has a stated cost of ₹1,800 crore and a site of 296.5 acres.
When was it filed?
The application was filed on 22 Nov 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Integrated Cement Plant - Clinker (3.3 Million TPA), Cement (3 Million TPA), CPP (27…
Project details
| Status | Withdrawn |
|---|---|
| Status since | 23 Nov 2023 |
| Application filed | 22 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Dalmia Cement Bharat Limited |
| Land area | 296.5 acres (120 ha) |
| Project cost | ₹1,800 crore |
| Village / locality | Hosahalli |
| Taluk / tehsil | Sedam |
| District | Kalaburagi |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00526 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Jul 2024 | Environmental approval granted | 296.5 acres | ₹1,800 crore |
| Early planning filed 22 Nov 2023 (this page) | Withdrawn | 296.5 acres | ₹1,800 crore |
In context
38 applications in Kalaburagi since January 2022 are in the same category (Industry): 23 approved, 9 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 296.5 acres, this one is smaller than 61% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hosahalli, Sedam, Kalaburagi, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Integrated Cement Plant - Clinker (3.3 Million TPA), Cement (3 Million TPA),… — environmental approval granted, 0 m away
- Expansion of Integrated Cement Plant - Clinker (9.0 to 13.3 Million TPA),… — environmental approval granted, 6.2 km away
- Expansion of Integrated Cement Plant - Clinker (9.0 to 13.3 Million TPA),… — cleared for impact study, 6.2 km away
- Transfer of Environmental Clearance for Expansion of Cement Plant Clinker -… — environmental approval granted, 6.3 km away
- Transfer of Environmental Clearance for Expansion of Integrated Cement Plant… — lapsed, 6.3 km away
- Yaddalli-Ternalli Lift Irrigation Scheme — under environmental review, 8 km away
- Transfer of Environmental Clearance for Injepalli Limestone Mine (ML Area… — environmental approval granted, 8 km away
- Proposed Udagi Limestone Block (Area: 646.34 ha) with Limestone Production… — cleared for impact study, 8.1 km away
More from Dalmia Cement Bharat Limited in Kalaburagi
- Chittapur SW Limestone Block over an area of 438 Ha. with Limestone production… — cleared for impact study
All 8 Dalmia Cement Bharat projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.