One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Expansion for Manufacturing of Resin
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 25 Oct 2023 |
| Application filed | 25 Oct 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Industry |
| Applicant | Gem Paints Private Limited |
| Land area | 2.2 acres (0.9 ha) |
| Project cost | ₹8.4 crore |
| Village / locality | Pemmanahalli |
| Taluk / tehsil | Nelamangala |
| District | Bengaluru Rural |
| State | Karnataka |
| Location from | Site boundary on record |
| Our reference | WID-KA-00571 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Expansion filed 23 Jan 2024 | Environmental approval granted | 2.2 acres | ₹8.4 crore |
| Early planning filed 25 Oct 2023 (this page) | Cleared for impact study | 2.2 acres | ₹8.4 crore |
In context
39 applications in Bengaluru Rural since January 2022 are in the same category (Industry): 27 approved, 8 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.2 acres, this one is smaller than 95% of them.
22 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pemmanahalli, Nelamangala, Bengaluru Rural, Karnataka. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Expansion for Manufacturing of Resin — environmental approval granted, 0 m away
- Transfer of Environment Clearance from M/s Ramky Enviro Engineers Ltd. to Re… — lapsed, 550 m away
- Expansion of Tmt Bar Production From 24,000 Tpa to 2,40,000 Tpa by Replacing 4… — more information requested, 600 m away
- Expansion of Tmt Bar Production From 24,000 Tpa to 2,40,000 Tpa by Replacing 4… — environmental approval granted, 600 m away
- Expansion of Tmt Bar Production From 24,000 Tpa to 2,40,000 Tpa by Replacing 4… — more information requested, 600 m away
- Active Pharmaceutical Ingredients (APIs) & Intermediates Manufacturing Unit by… — environmental approval granted, 650 m away
- Expansion of Aluminium Rolled and Extrusion Products Unit, enhancing the… — environmental approval granted, 900 m away
- Building project by Yana Solar Private Limited — environmental approval granted, 1.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.